Skip navigation

Gloucestershire Business News

Cotswold link road to re-open following safety repair work

Work to safely repair and reopen the road linking the A40 with the A429 near Northleach will take place next month.

The road at this site near Northleach known as 'Prison Copse Wall or the 'old A40'' has been closed for two years after the wall collapsed in spring 2017 and cracking appeared on the carriageway. Highways engineers have been working to establish the exact cause of the damage and design the best repair solution. Fixing these types of road faults can be complicated and take considerable time to fix.

location of Prison Copse

From 4 March to 27 March our highways crews will carry out road repairs including reconstructing the carriageway, drainage work, fencing, lining and new signage. Once the repairs have been completed, the county council will continue to monitor the condition of the road and surrounding area to make sure the road remains safe. An extension of the 30mph speed limit will be imposed and a short length of carriageway will be limited to a single lane with passing bays.

Cllr Vernon Smith, cabinet member for highways and flood, said: "The Prison Copse road linking the A40 and A429 near Northleach had to be closed. Safety has to be our number one priority, so a full road closure had to remain in place to protect the public. I understand that the road closure has caused inconvenience to local residents, therefore I'm pleased these safety improvements are taking place and I would like to thank local residents and road users for their ongoing patience."

Cllr Paul Hodgkinson, local county councillor for Bourton-on-the-Water and Northleach, said: "I've campaigned hard on behalf of residents to get this road re-opened. I know how important the route is for local residents and visitors alike, therefore I'm delighted our highways crews are now able to carry out the essential repairs to allow this popular route to link villages and Northleach together again."

Related Articles

Boeing announces distribution agreement with Ontic Image

Boeing announces distribution agreement with Ontic

Boeing will now distribute about 1,000 additional actuation and propulsion system products to Ontic.

Solar farm plans on the agenda Image

Solar farm plans on the agenda

Plans for a solar farm in Twigworth will be discussed by Tewkesbury Borough Council’s Planning Committee next week.

Special needs teacher defrauded £13,000 in benefits Image

Special needs teacher defrauded £13,000 in benefits

A teacher at a Cotswolds college cheated the State out of benefits by claiming she had to pay rent for a house that she actually owned.

EXCLUSIVE: Hotspot pub told signs have to go Image

EXCLUSIVE: Hotspot pub told signs have to go

Planners send pub giant back to the drawing board.

Copyright 2024 Moose Partnership Ltd. All rights reserved. Reproduction of any content is strictly forbidden without prior permission.